AGRICULTURAL / ABERDEENSHIRE
32,000 BIRD FREE-RANGE
POULTRY DEVELOPMENT.
From site preparation and groundworks through to polished internal floor slabs — a complete free-range poultry development delivered by RPD in Aberdeenshire.
- CATEGORY
- Agricultural
- LOCATION
- Aberdeenshire
- CAPACITY
- 32,000 birds
- SCOPE
- Siteworks, concrete & building
- FLOOR SLABS
- Completed in three pours
- FINISH
- Polished internal concrete
PROJECT OVERVIEW
FROM CIVILS TO
FINISHED FLOOR.
This 32,000 bird free-range poultry development brought together RPD's siteworks and concrete capability on a single agricultural site — ground preparation and foundations first, then the internal floor slabs that define the working environment inside the building.
01 / SITE
Site preparation and groundworks set the development out — earthworks, drainage and foundations prepared for the new unit.
02 / CONCRETE
Internal floor slabs completed in three pours, with polishing continuing through the night to achieve the finished surface.
03 / COMPLETE
The completed development stands ready for its 32,000 bird free-range operation, with concrete aprons and siteworks tying the site together.
CONCRETE FLOOR DELIVERY
THREE POURS.
ONE POLISHED FINISH.
The internal floor slabs were completed in three pours, with polishing work continuing through the night to achieve the finish the building needed. The result is a clean, hard-wearing polished concrete surface across the full footprint of the unit.
- Internal floor slabs completed in three pours
- Polished finish — work continuing through the night
- Site preparation, groundworks and foundations by RPD
- Concrete aprons and external siteworks around the building


PROJECT GALLERY
ON SITE.




RPD DELIVERY
ONE TEAM. ONE PROGRAMME. ONE POINT OF RESPONSIBILITY.
Groundworks, concrete and building works delivered by RPD's own in-house teams — the same joined-up approach we bring to agricultural, industrial and commercial projects across Scotland.

GOT A PROJECT IN MIND?LET'S BUILD IT.
From initial groundworks to the completed structure, talk to RPD about your next project.