Completed Highlands industrial canopy development with covered storage bays

INDUSTRIAL / HIGHLANDS

HIGHLANDS
INDUSTRIAL DEVELOPMENT.

A long-term covered storage development, delivered in phases — with an 88m × 60m total canopy layout providing approximately 700,000 cubic feet of covered storage.

CATEGORY
Industrial
LOCATION
Highlands
TOTAL CANOPY LAYOUT
88m × 60m
COVERED STORAGE
Approx. 700,000 cu ft
STRUCTURAL SOLUTION
Clear spans using carrier beams
STATUS
Phase Four completes the project

PROJECT OVERVIEW

COVERED STORAGE,
AT SCALE.

The Highlands Industrial Development is a large covered storage facility built up over several phases, with the completed canopy layout measuring 88m × 60m in total and providing approximately 700,000 cubic feet of storage.

Phase Four — two 22.5m × 30m buildings, 45m × 30m combined — completes the overall layout. Clear spans across the structures were achieved using carrier beams, keeping the covered areas open and usable underneath.

The steelwork was fabricated and erected by RPD's own teams, working around a live operational yard.

Structural steel frame erected at night on the Highlands industrial canopy development

STRUCTURAL SOLUTION

CLEAR SPANS.
CARRIER BEAMS.

Carrier beams allowed the canopy structures to achieve clear spans, removing intermediate support from the covered storage areas. Steelwork was erected in stages across the phases of the development, tying each new structure into the established 88m × 60m canopy layout.

  • 88m × 60m total completed canopy layout
  • Approx. 700,000 cu ft of covered storage
  • Clear spans achieved using carrier beams
  • Phase Four: two 22.5m × 30m buildings, 45m × 30m combined

PROJECT GALLERY

Completed Highlands canopy structure with open bays and covered storage below
Steel frame erection at night under site lighting on the Highlands development
Erected steel canopy frame under a clear sky at the Highlands site
Completed dark-clad canopy building with lorries loading on the concrete yard
Portal frame steelwork erected over the existing yard at the Highlands development
Night-time steel erection inside the Highlands canopy with access platforms
Canopy steel frame at dusk with a telehandler positioned alongside

RPD DELIVERY

ONE TEAM. ONE PROGRAMME. ONE POINT OF RESPONSIBILITY.

Steelwork for the development was fabricated in RPD's own UKCA / BS EN 1090 approved workshop and erected by our in-house crews, alongside our groundworks, concrete and cladding capability.