PLANT, TECHNOLOGY & EXPERTISE
THE RIGHT KIT.
THE RIGHT PEOPLE.
Owned plant, modern survey technology and experienced RPD operators keep accuracy, programme and quality under our control — from setting out and earthworks through lifting, cutting and fabrication.
01 / SETTING OUT
TOPCON TOTAL STATION
ACCURACY STARTS AT THE FIRST PEG.
Setting out is the first control point on any structure. Working with our own total station means levels, grid lines and base-bolt positions are established by the same team that pours the concrete and erects the steel — so the frame lands where it should.
- Setting out for buildings, foundations and site layout
- Base-bolt positioning ahead of steel erection
- Level and position checks kept in-house
SETTING OUT
LEVELS, GRIDS & SITE LAYOUT
BASE-BOLT POSITIONING
AHEAD OF STEEL ERECTION
LEVEL & POSITION CHECKS
KEPT IN-HOUSE
SAME-TEAM CONTROL
FROM PEG TO FRAME

02 / TRIMBLE EARTHWORKS
TRIMBLE EARTHWORKS
WORKING STRAIGHT FROM THE MODEL.
Trimble Earthworks puts the design in the cab. Grading and earthworks are worked to the model rather than to pegs alone, which keeps levels consistent across the site and reduces reworking before concrete follows.
- Trimble Earthworks used for grading and bulk earthworks
- Consistent levels across large site areas
- Fewer checks and less reworking between stages
LIVE DESIGN DATA
IN THE CAB
CUT/FILL GUIDANCE
REAL-TIME GRADING
AUTO BLADE/BUCKET
MACHINE GUIDANCE
REAL-TIME AS-BUILT
PROGRESS TRACKING
03 / SITE PREPARATION
CAT 265 CTL XPS
PREPARATION, GRADING AND FINISHING.
The CAT 265 compact track loader handles site preparation, grading and finishing work — including the tighter areas around buildings and aprons where larger machines are less practical. It is RPD-owned and RPD-operated, so it moves with the programme.
- Site preparation, grading and finishing work
- Effective in tight and confined site areas
- Owned and operated by RPD teams
74 HP
GROSS POWER
1,280 KG
RATED OPERATING CAPACITY
4,759 KG
OPERATING WEIGHT
129 L/MIN
XPS MAX HYDRAULIC FLOW

04 / LIFTING & ERECTION
MANITOU MRT 2660
LIFTING STEEL AND CLADDING INTO PLACE.
The Manitou MRT 2660 rotating telehandler supports steel erection and cladding, placing sections and sheets where the crews need them. Having our own lifting capability on site keeps erection and cladding sequences moving together.
- Lifting and placing structural steel on site
- Supporting roof and wall cladding works
- Reduces reliance on hired-in lifting
6,000
KG MAX CAPACITY
25.9 M
MAX LIFT HEIGHT
21.7 M
MAX OUTREACH
360°
ROTATION


05 / EARTHWORKS
JCB 150X HD
EXCAVATION WITHOUT SUBCONTRACT.
The latest JCB 150X HD is the second 150X HD unit to join the RPD fleet. It carries out excavation and bulk earthworks on RPD sites, and owning the machines means groundworks start when we are ready to start them, rather than when a subcontractor becomes available.
- Excavation, dig and bulk earthworks
- Groundworks programmed by RPD, not by others
- Carries RPD's own bespoke illuminated signage
81 kW
ENGINE OUTPUT
516 Nm
TORQUE
15 T
CLASS
360°
EXCAVATOR
06 / PLASMA CUTTING
MORGAN RUSHWORTH HYPERTHERM XPR300
CUT IN OUR OWN WORKSHOP.
Plasma cutting is carried out on the Morgan Rushworth Hypertherm XPR300 in RPD's own UKCA / BS EN 1090 approved fabrication workshop. Cutting steel in-house shortens the route from drawing to fabricated section and keeps quality under our control.
- Plasma cutting within RPD's own fabrication workshop
- Cutting and fabrication kept on one programme
- Supports UKCA / BS EN 1090 approved workshop output
300 A
PLASMA OUTPUT
80 MM
MAX MILD-STEEL CUT
50 MM
PIERCE CAPACITY
30 M/MIN
MAX POSITIONING SPEED


07 / FABRICATION & PEOPLE
IN-HOUSE TEAM
THE PEOPLE BEHIND THE KIT.
Plant is only as good as the people running it. RPD's fabricators, operators and site crews work to the same programme, which is what allows groundworks, concrete, steel and cladding to follow each other without hand-over gaps.
- In-house fabrication and site crews
- One programme across every stage of the build
- One point of responsibility from start to finish
FABRICATION
OWN WORKSHOP OUTPUT
GROUNDWORKS
EXCAVATION & CONCRETE
STEEL ERECTION
IN-HOUSE CREWS
CLADDING
ROOF & WALL ENVELOPES

ONE TEAM. ONE PROGRAMME.
OWNED PLANT, IN-HOUSE PEOPLE — ONE POINT OF RESPONSIBILITY.
Tell us about your project and we will bring the right plant, technology and crews to it.
START A PROJECT
GOT A PROJECT IN MIND?LET'S BUILD IT.
From initial groundworks to the completed structure, talk to RPD about your next project.